Pool kit in Duralinox

Price starting from just
Consult us
Complete swimming pool kit consists of metallic structure, liner, pool basin equipment, pipework and fittings, filtration system and accessories.
In stock
Pool kit in Duralinox, details :
Swimming pool kit - Duralinox panels (blue navy aluminium)DURALINOX swimming pool kits DURALINOX swimming pool kit. It is an alloy of several metals whose main component is aluminum. Its main advantage is that it is both anti-corrosive and rustproof and is extremely resistant to both atmospheric and marine conditions.
Extremely rigid and stable structure thanks to welded reinforcements and vertical bracing. Panels hight : 1,25 or 1,50 m.Panels thickness 2 mm.
Hang coping integrated to pool panels.
This type of the structure is only adapted to rectangular pools with round corners and 90° edges, ladder or steps.
All kinds of pool bottoms possible : upside-down pyramid, slope or flat bottom.
Corners radius 0,50m (optional)
10 years warranty on the pool structure.
Key features
![]() |
Other dimensions : consult us (*) Free delivery France mainland |
Swimming pool kit consists of

Filtration parts (Special anti-corrosion. No contact of the metallic structure with water.)
Great flow skimmer, large mouth
Return inlets
Universal wall fitting
Main drain
Underwater spotlight 12V/300W
| Dimension | Skimmer | Return inlet | Universal wall fitting | Main drain | Underwater light |
| 8 x 4 | 1 | 2 | 1 | 1 | 1 |
| 10 x 5 | 2 | 3 | 1 | 1 | 1 |
FILTRATION :
Sand filter backed with 10-year warranty that comes with 6 way multi-port valve and manometer.
Filtration pump backed with 2-year warranty, comes with a filter basket.
Water resistant Electrical box IP55 with fuse, clock, thermic circuit breaker, power switch, universal control panel.
Plumbing kit including 5 valves ¼ turn, elbows, Ts, rigid PVC unions (16 bars pressure), semi-rigid pipes to bury underground (10 years warranty), glue,
paint stripper, caulk for technical room (10m maximum distance from the pool).
| Dimension | Pump | Flow | Sand and gravel |
| 8 x 4 | 1 hp | 14 m3/h | 150 Kg |
| 10 x 5 | 1.5 hp | 21 m3/h | 300 Kg |
LINER :
Plain Liner 75/100 according to your pool dimensions, 5 standard colours with tilebands or patterned (optional)
Easy liner coping installation with self-tapping screws.
Rotproof protection felt 350 g/m2 and glue.
Light blue Mosaic * Cartago * | Adriatic blue Byzantine green * Epidor * | Caribbean green Byzantin bleu * Florentina * | Blanc Marbre * Mikonos * | Sand Servanne * Pompeia * |
(*) 5 standard colours, tilebands or patterned (optional) - non exhaustive list
MAINTENANCE :
| Maintenance Kit, Vac head Telescopic pole Floating hose Deep leafnet Water balance control kit Chlorine bucket 5 actions special liner | ![]() | 3-step stainless steel ladder with bracket | ![]() |
Option
| Roman steps* (10 years warranty) 2 m (inside) 1m radius reinforced acrylic: Price: Consult us 3 m (inside) 1,50m radius reinforced acrylic : Price: Consult us (*) Steps or ladder | ![]() |
Execution of earthwork plans are to be scrupulously respected.
Installation manual.
Use and maintenance guidelines.
Freephone hotline
Assembly stages
![]() Day 1 Unpack the swimming pool kit and install the panels. ![]() Day 1 Bolt the panels and set up the bracing, align the whole structure. ![]() Day 1 Install the step bay. ![]() Day 1 Line up the whole structure. ![]() Day 2 Pour the concrete over the bracing construction. ![]() Day 2 Brace the step bay, put rubble stones and pour concrete. ![]() Day 2 Prepare underwater spotlights and install universal wall fitting. ![]() Day 3 Pool hopper masonry and main drain installation. ![]() Day 3 Pool hopper masonry and main drain installation. ![]() Day 3 Screed the base before starting embankments. ![]() Day 4 Reinforce the upper part of the vertical bracing. ![]() Day 5 Install coping stones. ![]() Day 5 Finish liner installation. ![]() Day 7 Enjoy! | ![]() Day 1 Unpack the swimming pool kit and install the panels. ![]() Day 1 Bolt the panels and set up the bracing, align the whole structure. ![]() Day 1 Fasten the bracing to the ground with anchor rods. ![]() Day 2 Pour the concrete over the bracing construction. ![]() Day 2 Brace the step bay, put rubble stones and pour concrete. ![]() Day 2 Install flexible plumbing and return inlets. ![]() Day 3 Pool hopper masonry and main drain installation. ![]() Day 3 Pool hopper masonry and main drain installation. ![]() Day 3 Screed the base before starting embankments. ![]() Day 4 Complete the pool embankment perimeter. ![]() Day 4 Pour the concrete collar. ![]() Day 5 Install the liner using might vac. ![]() Day 6 Build the technical room and install the plumbing system. |
Actual products may vary from images shown
Prix TTC.
Prix TTC.
Ask for a free quote : Pool kit in Duralinox
Please fill in this form carefully. Our commercial service will handle your request promptly.










































